Manhattan Renovation and Expansion

September 2006 | October 2006 | November 2006 | December 2006 | January 2007

November 10, 2006
This first photo is of the storefront from the inside of the wooden structure that now covers it. I talked to the project manager and he said that it will very likely be revealed in two weeks. It was dark in that area so a lot of the detail can’t be seen but it’s really impressive. In the meantime, the main room of the ground floor Admissions Center is taking shape. Clear delineations of the office space and of the main area (pictured above) are very distinct now. Ducts have also been installed for atmosphere control.

November 26, 2006
The entrance area on the 11th floor had new wall installed that spans the length of the elevator bank. It makes a dramatic difference and the new ceilings will be in very soon. In the meeting and seminar theatre ducts for ventilation and atmosphere control are being fitted into ceiling and wiring and the electrical groundwork is being done now to make this multi-purpose space compliant for the equipment that will make it state-of-the-art.

September 2006 | October 2006 | November 2006 | December 2006 | January 2007

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

  • Mailing Address MCNY Manhattan (431 Canal Street New York, NY 10013)
  • Phone Number  (800) 33 THINK | 212 343 1234